Clarity Backed by Expertise
What am I responsible for?
1
Fees & Approvals
Impact fees, building fees, and surveys and engineering reports (including soil tests to determine if soil is suitable for building).
Site Preparation & Landscaping
Any fill dirt required on the lawn, grading of the lot, removal of trees, vegetation, or excess dirt, and landscaping. You will be given a quote for extra dirt needed for the build once you sign the contract and get your plans drawn up.
Utilities & Connections
Water meter, water meter and sewer connection fees, water and sewer lines to the house, water service, water well, pump and related equipment, septic tank, and underground electrical services or telephone service.
Structural & External Features
Cost of storm shutters required by code, floodlights, and driveways, walks, aprons, or ramps.
Appliances & Insurance
Washer, dryer, and refrigerator, as well as insurance.
Unforeseen Site Expenses
Expenses caused by underground concrete, springs, sinkholes, or contamination.
How do you determine project pricing?
2
Upgrades Requested
Custom selections, premium finishes, and floor plan modifications will be added to the baseline cost of the home.
Travel Distance
Logistics and transportation costs vary depending on the distance between our facility and your specific job site.
Building Restrictions
Local building codes, structural engineering compliance, or specific municipality requirements may impact the total scope and cost.
What is the typical project timeline?
3
A typical project takes approximately 6 to 9 months to complete after all permitting is finalized.
Our construction schedule is broken down into two primary stages, though final timelines can alter due to weather conditions or unforeseen circumstances:
Pre-Construction Phase
Before the clock starts on construction, we focus on choosing and customizing your floor plan, working with your bank to get all documents finalized, getting your colors choices and home selections ironed out. This stage concludes once engineering for the plans and the local municipality approves and issues all building permits.
Construction & Delivery Phase (6 to 9 Months)
Once permitting is completed, physical work begins. Groundbreaking, foundation work take place on your lot, and framing. The home is stick built, securely set onto the foundation, and all final interior and exterior finishes are completed.
What is not allowed?
4
To ensure safety, quality control, and compliance with building regulations, we do not allow homeowners to perform any labor or construction work on the home during the build process.
Additionally, for your personal safety, homeowners are strictly prohibited from walking onto or entering the job site while it is active.